I'm so very, very grateful for Jess (who came up after work Friday night and spent the night here). He and Jim prepped the floor before they could work on it today. Chad & Kaitlin came, Kevin and his two little kids came with him and Brent & Chelsey and family came. It took a long time to get the first few rows in and then they came up with a system and they worked pretty hard and fast. How grateful we were to see everyone show up and work so hard.
A really ugly room.
Prepping the floor.
Almost done with the first half. Chad's back had to be killing him by the time he was done. He is one hard worker! Kaitlin and Chelsey helped take care of McKay and Mia and we (the women) moved that pallet of flooring to the left in the photo over to the finished floor.
Sitting down to have some pizza for lunch.
Kevin had to leave about 2:00 p.m. to go do shift work until Midnight. That makes a very long day. He was awesome help!
Jess had very sweaty knees after he took the knee pads off. They had been on since about 8:00 a.m.
Brent did the flooring in the pantry. It was hard and slow to get around all the corners but it looks great!
The floor is dusty and will remain so until the whole floor is completed but it's still very beautiful. Tonight, however, I said, "This will never end!" I'm pretty sure the rest of the Utah kids feel the same way. Once again, thank you to each and every one of you. This would not be possible without your wisdom, experience and youthfulness.
3 comments:
It's amazing that even with all that time spent, we only got half the room done. Oh well, we'll get 'er done at some point.
The floor is GORGEOUS!!!
That floor is super good looking! Slowly but surely it's getting done and will be worth all the work.
Post a Comment